Build Journal

Progress from the site, newest first.

Foundation concrete placement — September 2026

Concrete placement for the foundation and stem walls. The reconstruction builds up from here.

Foundation forms and stem walls — September 2026

The house is down to the studs and shored while the stem walls are formed and the rebar goes in. The old footings are coming out in the foreground.

Foundation forms and stem walls — September 2026

Foundation excavation — July 2026

Footings and grade beams trenched below the existing framing, with the street and the ocean beyond.

Foundation excavation — July 2026